Alaskan Way Viaduct Replacement-SKANSKA

Alaskan Way Viaduct Replacement Phase 2 was a $116 million WSDOT job located in the Sodo District of downtown Seattle. DGS started dewatering for SKANSKA in September of 2010 and will continue to dewater for different venues of this job well into 2011 and beyond. DGS successfully dewatered, storm lines, electrical duct banks, communication duct banks, electrical vaults, sewer lines, manholes, catch basins, and a pump station.

Click on the photos below for a larger view.

1

« Back

"Gary and his crew (DGS) are very knowledgeable in the scope of dewatering. They do the necessary investigation beforehand to figure out the most economical way to get the groundwater to drop, so that we can do our work. DGS staff is friendly and always very pleasurable to work alongside. I will continue to use and endorse them for years to come." - Eric Jury, Estimator at SCE Inc.

Call Today! 253-682-7330

©2023 DGS • Designed Groundwater Services, LLC • All Rights Reserved. • Oregon License #CCB-193044 • Transparency in Coverage